English original · Authoritative AWS references are linked in each module.

Network Foundation and Connectivity

Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
AWS Control TowerOrganizationsEnglish original · Authoritative AWS references are linked in each module.
Learning outcomes / 学习成果
  • Network account and ownership — apply to a safe, reviewable architecture decision
  • IPAM and CIDR allocation — apply to a safe, reviewable architecture decision
  • Transit Gateway patterns — apply to a safe, reviewable architecture decision
  • Central egress and inspection — apply to a safe, reviewable architecture decision
  • Route 53 Resolver and DNS — apply to a safe, reviewable architecture decision
  • Hybrid connectivity options — apply to a safe, reviewable architecture decision
  • Connectivity design lab — apply to a safe, reviewable architecture decision
  • Routing failure analysis — apply to a safe, reviewable architecture decision

Schedule / 课程安排

#Module / 模块Minutes / 分钟
1Network account and ownership8
2IPAM and CIDR allocation8
3Transit Gateway patterns8
4Central egress and inspection8
5Route 53 Resolver and DNS8
6Hybrid connectivity options8
7Connectivity design lab8
8Routing failure analysis4
Use read-only discovery unless you have an explicitly authorized sandbox. Organization-wide controls can affect every member account.
Start / 开始 →

Network account and ownership

AWS Landing Zone · Network Foundation and Connectivity · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Network account and ownership: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Network account and ownership: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Network account and ownership: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Decision framework

For Network account and ownership, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Network account and ownership? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Network account and ownership trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Network account and ownership

Scenario: an acquisition brings three legacy AWS accounts. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Network account and ownership

Scenario: a regulated payment workload must prove separation of duties. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Network account and ownership

Scenario: a new Region is needed for data residency. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Network account and ownership

Scenario: a business unit needs an isolated experimentation space. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Network account and ownership

Scenario: a shared network team is moving from manual to managed routing. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Network account and ownership

Scenario: an audit finds inconsistent evidence across accounts. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Network account and ownership

Scenario: a security team must respond to a suspected credential leak. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Network account and ownership

Scenario: a merger changes account ownership and support boundaries. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Network account and ownership

Scenario: cost growth requires clearer shared-platform chargeback. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Network account and ownership

Scenario: a production recovery test misses its target RTO. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Network account and ownership

Scenario: a platform upgrade affects several delegated administrators. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Network account and ownership

Scenario: a workload team needs a temporary policy exception. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Network account and ownership

Scenario: a new team must be onboarded without management-account access. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Network account and ownership

Scenario: a logging destination policy is being hardened. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Network account and ownership

Scenario: a network inspection change risks asymmetric routing. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Network account and ownership

Scenario: a business-critical service needs a tested account exit path. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Network account and ownership

Scenario: an organization plans to split a large workload OU. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Network account and ownership

Scenario: an identity provider migration changes user lifecycle events. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Network account and ownership

Scenario: a compliance rule is noisy and creates alert fatigue. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Network account and ownership

Scenario: an incident requires evidence preservation across accounts. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Network account and ownership

Scenario: a sandbox account needs automatic expiry and cleanup. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Network account and ownership

Scenario: a partner integration requires narrowly scoped cross-account access. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Network account and ownership

Scenario: a shared-service outage affects several application teams. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Network account and ownership

Scenario: a new control must be introduced without blocking releases. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Network account and ownership

Scenario: a legacy account uses an unsupported baseline customization. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Network account and ownership

Scenario: a cost-sensitive team challenges centralized logging retention. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Network account and ownership

Scenario: a regional service lacks the expected feature parity. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Network account and ownership

Scenario: a security account needs a delegated service ownership transfer. For Network account and ownership, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Network account and ownership. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Network account and ownership

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Network account and ownership is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Network account and ownership without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Network account and ownership without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Network account and ownership without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Network account and ownership, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Network account and ownership. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Network account and ownership. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Network account and ownership. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Network account and ownership. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Network account and ownership. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Network account and ownership. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Network account and ownership. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Network account and ownership. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Network account and ownership check 1: which evidence proves the design meets its constraint?
  2. Network account and ownership check 2: which evidence proves the design meets its constraint?
  3. Network account and ownership check 3: which evidence proves the design meets its constraint?
  4. Network account and ownership check 4: which evidence proves the design meets its constraint?
  5. Network account and ownership check 5: which evidence proves the design meets its constraint?
  6. Network account and ownership check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Network account and ownership, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

IPAM and CIDR allocation

AWS Landing Zone · Network Foundation and Connectivity · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • IPAM and CIDR allocation: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • IPAM and CIDR allocation: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • IPAM and CIDR allocation: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Decision framework

For IPAM and CIDR allocation, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns IPAM and CIDR allocation? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

IPAM and CIDR allocation trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: IPAM and CIDR allocation

Scenario: an acquisition brings three legacy AWS accounts. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: IPAM and CIDR allocation

Scenario: a regulated payment workload must prove separation of duties. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: IPAM and CIDR allocation

Scenario: a new Region is needed for data residency. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: IPAM and CIDR allocation

Scenario: a business unit needs an isolated experimentation space. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: IPAM and CIDR allocation

Scenario: a shared network team is moving from manual to managed routing. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: IPAM and CIDR allocation

Scenario: an audit finds inconsistent evidence across accounts. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: IPAM and CIDR allocation

Scenario: a security team must respond to a suspected credential leak. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: IPAM and CIDR allocation

Scenario: a merger changes account ownership and support boundaries. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: IPAM and CIDR allocation

Scenario: cost growth requires clearer shared-platform chargeback. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: IPAM and CIDR allocation

Scenario: a production recovery test misses its target RTO. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: IPAM and CIDR allocation

Scenario: a platform upgrade affects several delegated administrators. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: IPAM and CIDR allocation

Scenario: a workload team needs a temporary policy exception. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: IPAM and CIDR allocation

Scenario: a new team must be onboarded without management-account access. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: IPAM and CIDR allocation

Scenario: a logging destination policy is being hardened. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: IPAM and CIDR allocation

Scenario: a network inspection change risks asymmetric routing. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: IPAM and CIDR allocation

Scenario: a business-critical service needs a tested account exit path. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: IPAM and CIDR allocation

Scenario: an organization plans to split a large workload OU. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: IPAM and CIDR allocation

Scenario: an identity provider migration changes user lifecycle events. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: IPAM and CIDR allocation

Scenario: a compliance rule is noisy and creates alert fatigue. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: IPAM and CIDR allocation

Scenario: an incident requires evidence preservation across accounts. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: IPAM and CIDR allocation

Scenario: a sandbox account needs automatic expiry and cleanup. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: IPAM and CIDR allocation

Scenario: a partner integration requires narrowly scoped cross-account access. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: IPAM and CIDR allocation

Scenario: a shared-service outage affects several application teams. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: IPAM and CIDR allocation

Scenario: a new control must be introduced without blocking releases. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: IPAM and CIDR allocation

Scenario: a legacy account uses an unsupported baseline customization. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: IPAM and CIDR allocation

Scenario: a cost-sensitive team challenges centralized logging retention. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: IPAM and CIDR allocation

Scenario: a regional service lacks the expected feature parity. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: IPAM and CIDR allocation

Scenario: a security account needs a delegated service ownership transfer. For IPAM and CIDR allocation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for IPAM and CIDR allocation. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for IPAM and CIDR allocation

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for IPAM and CIDR allocation is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for IPAM and CIDR allocation without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for IPAM and CIDR allocation without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for IPAM and CIDR allocation without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For IPAM and CIDR allocation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for IPAM and CIDR allocation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for IPAM and CIDR allocation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for IPAM and CIDR allocation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for IPAM and CIDR allocation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for IPAM and CIDR allocation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for IPAM and CIDR allocation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for IPAM and CIDR allocation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for IPAM and CIDR allocation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. IPAM and CIDR allocation check 1: which evidence proves the design meets its constraint?
  2. IPAM and CIDR allocation check 2: which evidence proves the design meets its constraint?
  3. IPAM and CIDR allocation check 3: which evidence proves the design meets its constraint?
  4. IPAM and CIDR allocation check 4: which evidence proves the design meets its constraint?
  5. IPAM and CIDR allocation check 5: which evidence proves the design meets its constraint?
  6. IPAM and CIDR allocation check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for IPAM and CIDR allocation, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Transit Gateway patterns

AWS Landing Zone · Network Foundation and Connectivity · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Transit Gateway patterns: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Transit Gateway patterns: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Transit Gateway patterns: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Decision framework

For Transit Gateway patterns, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Transit Gateway patterns? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Transit Gateway patterns trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Transit Gateway patterns

Scenario: an acquisition brings three legacy AWS accounts. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Transit Gateway patterns

Scenario: a regulated payment workload must prove separation of duties. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Transit Gateway patterns

Scenario: a new Region is needed for data residency. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Transit Gateway patterns

Scenario: a business unit needs an isolated experimentation space. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Transit Gateway patterns

Scenario: a shared network team is moving from manual to managed routing. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Transit Gateway patterns

Scenario: an audit finds inconsistent evidence across accounts. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Transit Gateway patterns

Scenario: a security team must respond to a suspected credential leak. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Transit Gateway patterns

Scenario: a merger changes account ownership and support boundaries. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Transit Gateway patterns

Scenario: cost growth requires clearer shared-platform chargeback. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Transit Gateway patterns

Scenario: a production recovery test misses its target RTO. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Transit Gateway patterns

Scenario: a platform upgrade affects several delegated administrators. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Transit Gateway patterns

Scenario: a workload team needs a temporary policy exception. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Transit Gateway patterns

Scenario: a new team must be onboarded without management-account access. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Transit Gateway patterns

Scenario: a logging destination policy is being hardened. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Transit Gateway patterns

Scenario: a network inspection change risks asymmetric routing. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Transit Gateway patterns

Scenario: a business-critical service needs a tested account exit path. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Transit Gateway patterns

Scenario: an organization plans to split a large workload OU. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Transit Gateway patterns

Scenario: an identity provider migration changes user lifecycle events. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Transit Gateway patterns

Scenario: a compliance rule is noisy and creates alert fatigue. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Transit Gateway patterns

Scenario: an incident requires evidence preservation across accounts. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Transit Gateway patterns

Scenario: a sandbox account needs automatic expiry and cleanup. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Transit Gateway patterns

Scenario: a partner integration requires narrowly scoped cross-account access. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Transit Gateway patterns

Scenario: a shared-service outage affects several application teams. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Transit Gateway patterns

Scenario: a new control must be introduced without blocking releases. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Transit Gateway patterns

Scenario: a legacy account uses an unsupported baseline customization. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Transit Gateway patterns

Scenario: a cost-sensitive team challenges centralized logging retention. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Transit Gateway patterns

Scenario: a regional service lacks the expected feature parity. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Transit Gateway patterns

Scenario: a security account needs a delegated service ownership transfer. For Transit Gateway patterns, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Transit Gateway patterns. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Transit Gateway patterns

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Transit Gateway patterns is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Transit Gateway patterns without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Transit Gateway patterns without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Transit Gateway patterns without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Transit Gateway patterns, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Transit Gateway patterns. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Transit Gateway patterns. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Transit Gateway patterns. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Transit Gateway patterns. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Transit Gateway patterns. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Transit Gateway patterns. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Transit Gateway patterns. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Transit Gateway patterns. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Transit Gateway patterns check 1: which evidence proves the design meets its constraint?
  2. Transit Gateway patterns check 2: which evidence proves the design meets its constraint?
  3. Transit Gateway patterns check 3: which evidence proves the design meets its constraint?
  4. Transit Gateway patterns check 4: which evidence proves the design meets its constraint?
  5. Transit Gateway patterns check 5: which evidence proves the design meets its constraint?
  6. Transit Gateway patterns check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Transit Gateway patterns, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Central egress and inspection

AWS Landing Zone · Network Foundation and Connectivity · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Central egress and inspection: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Central egress and inspection: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Central egress and inspection: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Decision framework

For Central egress and inspection, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Central egress and inspection? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Central egress and inspection trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Central egress and inspection

Scenario: an acquisition brings three legacy AWS accounts. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Central egress and inspection

Scenario: a regulated payment workload must prove separation of duties. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Central egress and inspection

Scenario: a new Region is needed for data residency. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Central egress and inspection

Scenario: a business unit needs an isolated experimentation space. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Central egress and inspection

Scenario: a shared network team is moving from manual to managed routing. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Central egress and inspection

Scenario: an audit finds inconsistent evidence across accounts. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Central egress and inspection

Scenario: a security team must respond to a suspected credential leak. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Central egress and inspection

Scenario: a merger changes account ownership and support boundaries. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Central egress and inspection

Scenario: cost growth requires clearer shared-platform chargeback. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Central egress and inspection

Scenario: a production recovery test misses its target RTO. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Central egress and inspection

Scenario: a platform upgrade affects several delegated administrators. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Central egress and inspection

Scenario: a workload team needs a temporary policy exception. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Central egress and inspection

Scenario: a new team must be onboarded without management-account access. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Central egress and inspection

Scenario: a logging destination policy is being hardened. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Central egress and inspection

Scenario: a network inspection change risks asymmetric routing. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Central egress and inspection

Scenario: a business-critical service needs a tested account exit path. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Central egress and inspection

Scenario: an organization plans to split a large workload OU. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Central egress and inspection

Scenario: an identity provider migration changes user lifecycle events. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Central egress and inspection

Scenario: a compliance rule is noisy and creates alert fatigue. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Central egress and inspection

Scenario: an incident requires evidence preservation across accounts. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Central egress and inspection

Scenario: a sandbox account needs automatic expiry and cleanup. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Central egress and inspection

Scenario: a partner integration requires narrowly scoped cross-account access. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Central egress and inspection

Scenario: a shared-service outage affects several application teams. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Central egress and inspection

Scenario: a new control must be introduced without blocking releases. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Central egress and inspection

Scenario: a legacy account uses an unsupported baseline customization. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Central egress and inspection

Scenario: a cost-sensitive team challenges centralized logging retention. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Central egress and inspection

Scenario: a regional service lacks the expected feature parity. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Central egress and inspection

Scenario: a security account needs a delegated service ownership transfer. For Central egress and inspection, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Central egress and inspection. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Central egress and inspection

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Central egress and inspection is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Central egress and inspection without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Central egress and inspection without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Central egress and inspection without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Central egress and inspection, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Central egress and inspection. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Central egress and inspection. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Central egress and inspection. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Central egress and inspection. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Central egress and inspection. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Central egress and inspection. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Central egress and inspection. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Central egress and inspection. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Central egress and inspection check 1: which evidence proves the design meets its constraint?
  2. Central egress and inspection check 2: which evidence proves the design meets its constraint?
  3. Central egress and inspection check 3: which evidence proves the design meets its constraint?
  4. Central egress and inspection check 4: which evidence proves the design meets its constraint?
  5. Central egress and inspection check 5: which evidence proves the design meets its constraint?
  6. Central egress and inspection check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Central egress and inspection, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Route 53 Resolver and DNS

AWS Landing Zone · Network Foundation and Connectivity · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Route 53 Resolver and DNS: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Route 53 Resolver and DNS: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Route 53 Resolver and DNS: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Decision framework

For Route 53 Resolver and DNS, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Route 53 Resolver and DNS? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Route 53 Resolver and DNS trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Route 53 Resolver and DNS

Scenario: an acquisition brings three legacy AWS accounts. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Route 53 Resolver and DNS

Scenario: a regulated payment workload must prove separation of duties. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Route 53 Resolver and DNS

Scenario: a new Region is needed for data residency. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Route 53 Resolver and DNS

Scenario: a business unit needs an isolated experimentation space. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Route 53 Resolver and DNS

Scenario: a shared network team is moving from manual to managed routing. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Route 53 Resolver and DNS

Scenario: an audit finds inconsistent evidence across accounts. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Route 53 Resolver and DNS

Scenario: a security team must respond to a suspected credential leak. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Route 53 Resolver and DNS

Scenario: a merger changes account ownership and support boundaries. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Route 53 Resolver and DNS

Scenario: cost growth requires clearer shared-platform chargeback. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Route 53 Resolver and DNS

Scenario: a production recovery test misses its target RTO. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Route 53 Resolver and DNS

Scenario: a platform upgrade affects several delegated administrators. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Route 53 Resolver and DNS

Scenario: a workload team needs a temporary policy exception. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Route 53 Resolver and DNS

Scenario: a new team must be onboarded without management-account access. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Route 53 Resolver and DNS

Scenario: a logging destination policy is being hardened. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Route 53 Resolver and DNS

Scenario: a network inspection change risks asymmetric routing. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Route 53 Resolver and DNS

Scenario: a business-critical service needs a tested account exit path. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Route 53 Resolver and DNS

Scenario: an organization plans to split a large workload OU. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Route 53 Resolver and DNS

Scenario: an identity provider migration changes user lifecycle events. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Route 53 Resolver and DNS

Scenario: a compliance rule is noisy and creates alert fatigue. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Route 53 Resolver and DNS

Scenario: an incident requires evidence preservation across accounts. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Route 53 Resolver and DNS

Scenario: a sandbox account needs automatic expiry and cleanup. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Route 53 Resolver and DNS

Scenario: a partner integration requires narrowly scoped cross-account access. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Route 53 Resolver and DNS

Scenario: a shared-service outage affects several application teams. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Route 53 Resolver and DNS

Scenario: a new control must be introduced without blocking releases. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Route 53 Resolver and DNS

Scenario: a legacy account uses an unsupported baseline customization. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Route 53 Resolver and DNS

Scenario: a cost-sensitive team challenges centralized logging retention. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Route 53 Resolver and DNS

Scenario: a regional service lacks the expected feature parity. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Route 53 Resolver and DNS

Scenario: a security account needs a delegated service ownership transfer. For Route 53 Resolver and DNS, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Route 53 Resolver and DNS. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Route 53 Resolver and DNS

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Route 53 Resolver and DNS is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Route 53 Resolver and DNS without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Route 53 Resolver and DNS without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Route 53 Resolver and DNS without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Route 53 Resolver and DNS, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Route 53 Resolver and DNS. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Route 53 Resolver and DNS. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Route 53 Resolver and DNS. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Route 53 Resolver and DNS. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Route 53 Resolver and DNS. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Route 53 Resolver and DNS. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Route 53 Resolver and DNS. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Route 53 Resolver and DNS. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Route 53 Resolver and DNS check 1: which evidence proves the design meets its constraint?
  2. Route 53 Resolver and DNS check 2: which evidence proves the design meets its constraint?
  3. Route 53 Resolver and DNS check 3: which evidence proves the design meets its constraint?
  4. Route 53 Resolver and DNS check 4: which evidence proves the design meets its constraint?
  5. Route 53 Resolver and DNS check 5: which evidence proves the design meets its constraint?
  6. Route 53 Resolver and DNS check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Route 53 Resolver and DNS, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Hybrid connectivity options

AWS Landing Zone · Network Foundation and Connectivity · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Hybrid connectivity options: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Hybrid connectivity options: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Hybrid connectivity options: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Decision framework

For Hybrid connectivity options, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Hybrid connectivity options? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Hybrid connectivity options trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Hybrid connectivity options

Scenario: an acquisition brings three legacy AWS accounts. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Hybrid connectivity options

Scenario: a regulated payment workload must prove separation of duties. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Hybrid connectivity options

Scenario: a new Region is needed for data residency. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Hybrid connectivity options

Scenario: a business unit needs an isolated experimentation space. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Hybrid connectivity options

Scenario: a shared network team is moving from manual to managed routing. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Hybrid connectivity options

Scenario: an audit finds inconsistent evidence across accounts. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Hybrid connectivity options

Scenario: a security team must respond to a suspected credential leak. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Hybrid connectivity options

Scenario: a merger changes account ownership and support boundaries. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Hybrid connectivity options

Scenario: cost growth requires clearer shared-platform chargeback. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Hybrid connectivity options

Scenario: a production recovery test misses its target RTO. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Hybrid connectivity options

Scenario: a platform upgrade affects several delegated administrators. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Hybrid connectivity options

Scenario: a workload team needs a temporary policy exception. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Hybrid connectivity options

Scenario: a new team must be onboarded without management-account access. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Hybrid connectivity options

Scenario: a logging destination policy is being hardened. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Hybrid connectivity options

Scenario: a network inspection change risks asymmetric routing. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Hybrid connectivity options

Scenario: a business-critical service needs a tested account exit path. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Hybrid connectivity options

Scenario: an organization plans to split a large workload OU. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Hybrid connectivity options

Scenario: an identity provider migration changes user lifecycle events. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Hybrid connectivity options

Scenario: a compliance rule is noisy and creates alert fatigue. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Hybrid connectivity options

Scenario: an incident requires evidence preservation across accounts. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Hybrid connectivity options

Scenario: a sandbox account needs automatic expiry and cleanup. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Hybrid connectivity options

Scenario: a partner integration requires narrowly scoped cross-account access. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Hybrid connectivity options

Scenario: a shared-service outage affects several application teams. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Hybrid connectivity options

Scenario: a new control must be introduced without blocking releases. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Hybrid connectivity options

Scenario: a legacy account uses an unsupported baseline customization. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Hybrid connectivity options

Scenario: a cost-sensitive team challenges centralized logging retention. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Hybrid connectivity options

Scenario: a regional service lacks the expected feature parity. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Hybrid connectivity options

Scenario: a security account needs a delegated service ownership transfer. For Hybrid connectivity options, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Hybrid connectivity options. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Hybrid connectivity options

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Hybrid connectivity options is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Hybrid connectivity options without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Hybrid connectivity options without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Hybrid connectivity options without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Hybrid connectivity options, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Hybrid connectivity options. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Hybrid connectivity options. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Hybrid connectivity options. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Hybrid connectivity options. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Hybrid connectivity options. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Hybrid connectivity options. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Hybrid connectivity options. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Hybrid connectivity options. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Hybrid connectivity options check 1: which evidence proves the design meets its constraint?
  2. Hybrid connectivity options check 2: which evidence proves the design meets its constraint?
  3. Hybrid connectivity options check 3: which evidence proves the design meets its constraint?
  4. Hybrid connectivity options check 4: which evidence proves the design meets its constraint?
  5. Hybrid connectivity options check 5: which evidence proves the design meets its constraint?
  6. Hybrid connectivity options check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Hybrid connectivity options, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Connectivity design lab

AWS Landing Zone · Network Foundation and Connectivity · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Connectivity design lab: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Connectivity design lab: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Connectivity design lab: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Decision framework

For Connectivity design lab, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Connectivity design lab? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Connectivity design lab trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Connectivity design lab

Scenario: an acquisition brings three legacy AWS accounts. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Connectivity design lab

Scenario: a regulated payment workload must prove separation of duties. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Connectivity design lab

Scenario: a new Region is needed for data residency. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Connectivity design lab

Scenario: a business unit needs an isolated experimentation space. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Connectivity design lab

Scenario: a shared network team is moving from manual to managed routing. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Connectivity design lab

Scenario: an audit finds inconsistent evidence across accounts. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Connectivity design lab

Scenario: a security team must respond to a suspected credential leak. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Connectivity design lab

Scenario: a merger changes account ownership and support boundaries. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Connectivity design lab

Scenario: cost growth requires clearer shared-platform chargeback. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Connectivity design lab

Scenario: a production recovery test misses its target RTO. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Connectivity design lab

Scenario: a platform upgrade affects several delegated administrators. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Connectivity design lab

Scenario: a workload team needs a temporary policy exception. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Connectivity design lab

Scenario: a new team must be onboarded without management-account access. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Connectivity design lab

Scenario: a logging destination policy is being hardened. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Connectivity design lab

Scenario: a network inspection change risks asymmetric routing. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Connectivity design lab

Scenario: a business-critical service needs a tested account exit path. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Connectivity design lab

Scenario: an organization plans to split a large workload OU. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Connectivity design lab

Scenario: an identity provider migration changes user lifecycle events. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Connectivity design lab

Scenario: a compliance rule is noisy and creates alert fatigue. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Connectivity design lab

Scenario: an incident requires evidence preservation across accounts. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Connectivity design lab

Scenario: a sandbox account needs automatic expiry and cleanup. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Connectivity design lab

Scenario: a partner integration requires narrowly scoped cross-account access. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Connectivity design lab

Scenario: a shared-service outage affects several application teams. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Connectivity design lab

Scenario: a new control must be introduced without blocking releases. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Connectivity design lab

Scenario: a legacy account uses an unsupported baseline customization. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Connectivity design lab

Scenario: a cost-sensitive team challenges centralized logging retention. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Connectivity design lab

Scenario: a regional service lacks the expected feature parity. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Connectivity design lab

Scenario: a security account needs a delegated service ownership transfer. For Connectivity design lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Connectivity design lab. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Connectivity design lab

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Connectivity design lab is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Connectivity design lab without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Connectivity design lab without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Connectivity design lab without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Connectivity design lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Connectivity design lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Connectivity design lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Connectivity design lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Connectivity design lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Connectivity design lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Connectivity design lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Connectivity design lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Connectivity design lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Connectivity design lab check 1: which evidence proves the design meets its constraint?
  2. Connectivity design lab check 2: which evidence proves the design meets its constraint?
  3. Connectivity design lab check 3: which evidence proves the design meets its constraint?
  4. Connectivity design lab check 4: which evidence proves the design meets its constraint?
  5. Connectivity design lab check 5: which evidence proves the design meets its constraint?
  6. Connectivity design lab check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Connectivity design lab, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Routing failure analysis

AWS Landing Zone · Network Foundation and Connectivity · 4 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Routing failure analysis: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Routing failure analysis: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.
  • Routing failure analysis: Explain its boundaries, accountable owner, risk and trade-offs; Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Decision framework

For Routing failure analysis, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Routing failure analysis? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Routing failure analysis trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Routing failure analysis

Scenario: an acquisition brings three legacy AWS accounts. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Routing failure analysis

Scenario: a regulated payment workload must prove separation of duties. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Routing failure analysis

Scenario: a new Region is needed for data residency. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Routing failure analysis

Scenario: a business unit needs an isolated experimentation space. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Routing failure analysis

Scenario: a shared network team is moving from manual to managed routing. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Routing failure analysis

Scenario: an audit finds inconsistent evidence across accounts. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Routing failure analysis

Scenario: a security team must respond to a suspected credential leak. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Routing failure analysis

Scenario: a merger changes account ownership and support boundaries. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Routing failure analysis

Scenario: cost growth requires clearer shared-platform chargeback. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Routing failure analysis

Scenario: a production recovery test misses its target RTO. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Routing failure analysis

Scenario: a platform upgrade affects several delegated administrators. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Routing failure analysis

Scenario: a workload team needs a temporary policy exception. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Routing failure analysis

Scenario: a new team must be onboarded without management-account access. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Routing failure analysis

Scenario: a logging destination policy is being hardened. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Routing failure analysis

Scenario: a network inspection change risks asymmetric routing. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Routing failure analysis

Scenario: a business-critical service needs a tested account exit path. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Routing failure analysis

Scenario: an organization plans to split a large workload OU. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Routing failure analysis

Scenario: an identity provider migration changes user lifecycle events. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Routing failure analysis

Scenario: a compliance rule is noisy and creates alert fatigue. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Routing failure analysis

Scenario: an incident requires evidence preservation across accounts. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Routing failure analysis

Scenario: a sandbox account needs automatic expiry and cleanup. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Routing failure analysis

Scenario: a partner integration requires narrowly scoped cross-account access. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Routing failure analysis

Scenario: a shared-service outage affects several application teams. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Routing failure analysis

Scenario: a new control must be introduced without blocking releases. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Routing failure analysis

Scenario: a legacy account uses an unsupported baseline customization. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Routing failure analysis

Scenario: a cost-sensitive team challenges centralized logging retention. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Routing failure analysis

Scenario: a regional service lacks the expected feature parity. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Routing failure analysis

Scenario: a security account needs a delegated service ownership transfer. For Routing failure analysis, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Routing failure analysis. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Routing failure analysis

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Routing failure analysis is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Routing failure analysis without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Routing failure analysis without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Routing failure analysis without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Routing failure analysis, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Routing failure analysis. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Routing failure analysis. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Routing failure analysis. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Routing failure analysis. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Routing failure analysis. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Routing failure analysis. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Routing failure analysis. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Routing failure analysis. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Routing failure analysis check 1: which evidence proves the design meets its constraint?
  2. Routing failure analysis check 2: which evidence proves the design meets its constraint?
  3. Routing failure analysis check 3: which evidence proves the design meets its constraint?
  4. Routing failure analysis check 4: which evidence proves the design meets its constraint?
  5. Routing failure analysis check 5: which evidence proves the design meets its constraint?
  6. Routing failure analysis check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Routing failure analysis, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Field checklist / 实战清单

Network account and ownership

Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

IPAM and CIDR allocation

Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Transit Gateway patterns

Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Central egress and inspection

Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Route 53 Resolver and DNS

Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Hybrid connectivity options

Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Connectivity design lab

Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Routing failure analysis

Plan IP space, VPC patterns, Transit Gateway, DNS, egress, inspection and hybrid connectivity across accounts.

Official references / 官方参考