English original · Authoritative AWS references are linked in each module.

Security Operations, Logging and Resilience

Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
AWS Control TowerOrganizationsEnglish original · Authoritative AWS references are linked in each module.
Learning outcomes / 学习成果
  • Organization CloudTrail and log archive — apply to a safe, reviewable architecture decision
  • AWS Config and evidence retention — apply to a safe, reviewable architecture decision
  • GuardDuty and Security Hub — apply to a safe, reviewable architecture decision
  • KMS key ownership and rotation — apply to a safe, reviewable architecture decision
  • Backup policies and restore tests — apply to a safe, reviewable architecture decision
  • Incident response across accounts — apply to a safe, reviewable architecture decision
  • Log integrity lab — apply to a safe, reviewable architecture decision
  • Recovery and escalation exercise — apply to a safe, reviewable architecture decision

Schedule / 课程安排

#Module / 模块Minutes / 分钟
1Organization CloudTrail and log archive8
2AWS Config and evidence retention8
3GuardDuty and Security Hub8
4KMS key ownership and rotation8
5Backup policies and restore tests8
6Incident response across accounts8
7Log integrity lab8
8Recovery and escalation exercise4
Use read-only discovery unless you have an explicitly authorized sandbox. Organization-wide controls can affect every member account.
Start / 开始 →

Organization CloudTrail and log archive

AWS Landing Zone · Security Operations, Logging and Resilience · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Organization CloudTrail and log archive: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • Organization CloudTrail and log archive: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • Organization CloudTrail and log archive: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Decision framework

For Organization CloudTrail and log archive, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Organization CloudTrail and log archive? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Organization CloudTrail and log archive trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Organization CloudTrail and log archive

Scenario: an acquisition brings three legacy AWS accounts. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Organization CloudTrail and log archive

Scenario: a regulated payment workload must prove separation of duties. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Organization CloudTrail and log archive

Scenario: a new Region is needed for data residency. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Organization CloudTrail and log archive

Scenario: a business unit needs an isolated experimentation space. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Organization CloudTrail and log archive

Scenario: a shared network team is moving from manual to managed routing. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Organization CloudTrail and log archive

Scenario: an audit finds inconsistent evidence across accounts. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Organization CloudTrail and log archive

Scenario: a security team must respond to a suspected credential leak. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Organization CloudTrail and log archive

Scenario: a merger changes account ownership and support boundaries. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Organization CloudTrail and log archive

Scenario: cost growth requires clearer shared-platform chargeback. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Organization CloudTrail and log archive

Scenario: a production recovery test misses its target RTO. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Organization CloudTrail and log archive

Scenario: a platform upgrade affects several delegated administrators. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Organization CloudTrail and log archive

Scenario: a workload team needs a temporary policy exception. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Organization CloudTrail and log archive

Scenario: a new team must be onboarded without management-account access. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Organization CloudTrail and log archive

Scenario: a logging destination policy is being hardened. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Organization CloudTrail and log archive

Scenario: a network inspection change risks asymmetric routing. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Organization CloudTrail and log archive

Scenario: a business-critical service needs a tested account exit path. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Organization CloudTrail and log archive

Scenario: an organization plans to split a large workload OU. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Organization CloudTrail and log archive

Scenario: an identity provider migration changes user lifecycle events. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Organization CloudTrail and log archive

Scenario: a compliance rule is noisy and creates alert fatigue. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Organization CloudTrail and log archive

Scenario: an incident requires evidence preservation across accounts. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Organization CloudTrail and log archive

Scenario: a sandbox account needs automatic expiry and cleanup. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Organization CloudTrail and log archive

Scenario: a partner integration requires narrowly scoped cross-account access. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Organization CloudTrail and log archive

Scenario: a shared-service outage affects several application teams. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Organization CloudTrail and log archive

Scenario: a new control must be introduced without blocking releases. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Organization CloudTrail and log archive

Scenario: a legacy account uses an unsupported baseline customization. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Organization CloudTrail and log archive

Scenario: a cost-sensitive team challenges centralized logging retention. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Organization CloudTrail and log archive

Scenario: a regional service lacks the expected feature parity. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Organization CloudTrail and log archive

Scenario: a security account needs a delegated service ownership transfer. For Organization CloudTrail and log archive, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Organization CloudTrail and log archive. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Organization CloudTrail and log archive

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Organization CloudTrail and log archive is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Organization CloudTrail and log archive without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Organization CloudTrail and log archive without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Organization CloudTrail and log archive without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Organization CloudTrail and log archive, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Organization CloudTrail and log archive. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Organization CloudTrail and log archive. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Organization CloudTrail and log archive. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Organization CloudTrail and log archive. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Organization CloudTrail and log archive. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Organization CloudTrail and log archive. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Organization CloudTrail and log archive. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Organization CloudTrail and log archive. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Organization CloudTrail and log archive check 1: which evidence proves the design meets its constraint?
  2. Organization CloudTrail and log archive check 2: which evidence proves the design meets its constraint?
  3. Organization CloudTrail and log archive check 3: which evidence proves the design meets its constraint?
  4. Organization CloudTrail and log archive check 4: which evidence proves the design meets its constraint?
  5. Organization CloudTrail and log archive check 5: which evidence proves the design meets its constraint?
  6. Organization CloudTrail and log archive check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Organization CloudTrail and log archive, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

AWS Config and evidence retention

AWS Landing Zone · Security Operations, Logging and Resilience · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • AWS Config and evidence retention: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • AWS Config and evidence retention: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • AWS Config and evidence retention: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Decision framework

For AWS Config and evidence retention, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns AWS Config and evidence retention? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

AWS Config and evidence retention trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: AWS Config and evidence retention

Scenario: an acquisition brings three legacy AWS accounts. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: AWS Config and evidence retention

Scenario: a regulated payment workload must prove separation of duties. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: AWS Config and evidence retention

Scenario: a new Region is needed for data residency. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: AWS Config and evidence retention

Scenario: a business unit needs an isolated experimentation space. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: AWS Config and evidence retention

Scenario: a shared network team is moving from manual to managed routing. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: AWS Config and evidence retention

Scenario: an audit finds inconsistent evidence across accounts. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: AWS Config and evidence retention

Scenario: a security team must respond to a suspected credential leak. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: AWS Config and evidence retention

Scenario: a merger changes account ownership and support boundaries. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: AWS Config and evidence retention

Scenario: cost growth requires clearer shared-platform chargeback. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: AWS Config and evidence retention

Scenario: a production recovery test misses its target RTO. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: AWS Config and evidence retention

Scenario: a platform upgrade affects several delegated administrators. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: AWS Config and evidence retention

Scenario: a workload team needs a temporary policy exception. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: AWS Config and evidence retention

Scenario: a new team must be onboarded without management-account access. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: AWS Config and evidence retention

Scenario: a logging destination policy is being hardened. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: AWS Config and evidence retention

Scenario: a network inspection change risks asymmetric routing. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: AWS Config and evidence retention

Scenario: a business-critical service needs a tested account exit path. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: AWS Config and evidence retention

Scenario: an organization plans to split a large workload OU. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: AWS Config and evidence retention

Scenario: an identity provider migration changes user lifecycle events. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: AWS Config and evidence retention

Scenario: a compliance rule is noisy and creates alert fatigue. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: AWS Config and evidence retention

Scenario: an incident requires evidence preservation across accounts. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: AWS Config and evidence retention

Scenario: a sandbox account needs automatic expiry and cleanup. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: AWS Config and evidence retention

Scenario: a partner integration requires narrowly scoped cross-account access. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: AWS Config and evidence retention

Scenario: a shared-service outage affects several application teams. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: AWS Config and evidence retention

Scenario: a new control must be introduced without blocking releases. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: AWS Config and evidence retention

Scenario: a legacy account uses an unsupported baseline customization. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: AWS Config and evidence retention

Scenario: a cost-sensitive team challenges centralized logging retention. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: AWS Config and evidence retention

Scenario: a regional service lacks the expected feature parity. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: AWS Config and evidence retention

Scenario: a security account needs a delegated service ownership transfer. For AWS Config and evidence retention, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for AWS Config and evidence retention. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for AWS Config and evidence retention

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for AWS Config and evidence retention is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for AWS Config and evidence retention without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for AWS Config and evidence retention without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for AWS Config and evidence retention without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For AWS Config and evidence retention, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for AWS Config and evidence retention. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for AWS Config and evidence retention. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for AWS Config and evidence retention. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for AWS Config and evidence retention. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for AWS Config and evidence retention. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for AWS Config and evidence retention. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for AWS Config and evidence retention. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for AWS Config and evidence retention. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. AWS Config and evidence retention check 1: which evidence proves the design meets its constraint?
  2. AWS Config and evidence retention check 2: which evidence proves the design meets its constraint?
  3. AWS Config and evidence retention check 3: which evidence proves the design meets its constraint?
  4. AWS Config and evidence retention check 4: which evidence proves the design meets its constraint?
  5. AWS Config and evidence retention check 5: which evidence proves the design meets its constraint?
  6. AWS Config and evidence retention check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for AWS Config and evidence retention, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

GuardDuty and Security Hub

AWS Landing Zone · Security Operations, Logging and Resilience · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • GuardDuty and Security Hub: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • GuardDuty and Security Hub: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • GuardDuty and Security Hub: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Decision framework

For GuardDuty and Security Hub, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns GuardDuty and Security Hub? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

GuardDuty and Security Hub trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: GuardDuty and Security Hub

Scenario: an acquisition brings three legacy AWS accounts. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: GuardDuty and Security Hub

Scenario: a regulated payment workload must prove separation of duties. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: GuardDuty and Security Hub

Scenario: a new Region is needed for data residency. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: GuardDuty and Security Hub

Scenario: a business unit needs an isolated experimentation space. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: GuardDuty and Security Hub

Scenario: a shared network team is moving from manual to managed routing. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: GuardDuty and Security Hub

Scenario: an audit finds inconsistent evidence across accounts. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: GuardDuty and Security Hub

Scenario: a security team must respond to a suspected credential leak. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: GuardDuty and Security Hub

Scenario: a merger changes account ownership and support boundaries. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: GuardDuty and Security Hub

Scenario: cost growth requires clearer shared-platform chargeback. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: GuardDuty and Security Hub

Scenario: a production recovery test misses its target RTO. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: GuardDuty and Security Hub

Scenario: a platform upgrade affects several delegated administrators. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: GuardDuty and Security Hub

Scenario: a workload team needs a temporary policy exception. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: GuardDuty and Security Hub

Scenario: a new team must be onboarded without management-account access. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: GuardDuty and Security Hub

Scenario: a logging destination policy is being hardened. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: GuardDuty and Security Hub

Scenario: a network inspection change risks asymmetric routing. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: GuardDuty and Security Hub

Scenario: a business-critical service needs a tested account exit path. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: GuardDuty and Security Hub

Scenario: an organization plans to split a large workload OU. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: GuardDuty and Security Hub

Scenario: an identity provider migration changes user lifecycle events. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: GuardDuty and Security Hub

Scenario: a compliance rule is noisy and creates alert fatigue. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: GuardDuty and Security Hub

Scenario: an incident requires evidence preservation across accounts. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: GuardDuty and Security Hub

Scenario: a sandbox account needs automatic expiry and cleanup. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: GuardDuty and Security Hub

Scenario: a partner integration requires narrowly scoped cross-account access. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: GuardDuty and Security Hub

Scenario: a shared-service outage affects several application teams. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: GuardDuty and Security Hub

Scenario: a new control must be introduced without blocking releases. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: GuardDuty and Security Hub

Scenario: a legacy account uses an unsupported baseline customization. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: GuardDuty and Security Hub

Scenario: a cost-sensitive team challenges centralized logging retention. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: GuardDuty and Security Hub

Scenario: a regional service lacks the expected feature parity. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: GuardDuty and Security Hub

Scenario: a security account needs a delegated service ownership transfer. For GuardDuty and Security Hub, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for GuardDuty and Security Hub. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for GuardDuty and Security Hub

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for GuardDuty and Security Hub is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for GuardDuty and Security Hub without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for GuardDuty and Security Hub without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for GuardDuty and Security Hub without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For GuardDuty and Security Hub, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for GuardDuty and Security Hub. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for GuardDuty and Security Hub. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for GuardDuty and Security Hub. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for GuardDuty and Security Hub. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for GuardDuty and Security Hub. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for GuardDuty and Security Hub. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for GuardDuty and Security Hub. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for GuardDuty and Security Hub. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. GuardDuty and Security Hub check 1: which evidence proves the design meets its constraint?
  2. GuardDuty and Security Hub check 2: which evidence proves the design meets its constraint?
  3. GuardDuty and Security Hub check 3: which evidence proves the design meets its constraint?
  4. GuardDuty and Security Hub check 4: which evidence proves the design meets its constraint?
  5. GuardDuty and Security Hub check 5: which evidence proves the design meets its constraint?
  6. GuardDuty and Security Hub check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for GuardDuty and Security Hub, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

KMS key ownership and rotation

AWS Landing Zone · Security Operations, Logging and Resilience · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • KMS key ownership and rotation: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • KMS key ownership and rotation: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • KMS key ownership and rotation: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Decision framework

For KMS key ownership and rotation, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns KMS key ownership and rotation? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

KMS key ownership and rotation trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: KMS key ownership and rotation

Scenario: an acquisition brings three legacy AWS accounts. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: KMS key ownership and rotation

Scenario: a regulated payment workload must prove separation of duties. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: KMS key ownership and rotation

Scenario: a new Region is needed for data residency. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: KMS key ownership and rotation

Scenario: a business unit needs an isolated experimentation space. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: KMS key ownership and rotation

Scenario: a shared network team is moving from manual to managed routing. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: KMS key ownership and rotation

Scenario: an audit finds inconsistent evidence across accounts. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: KMS key ownership and rotation

Scenario: a security team must respond to a suspected credential leak. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: KMS key ownership and rotation

Scenario: a merger changes account ownership and support boundaries. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: KMS key ownership and rotation

Scenario: cost growth requires clearer shared-platform chargeback. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: KMS key ownership and rotation

Scenario: a production recovery test misses its target RTO. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: KMS key ownership and rotation

Scenario: a platform upgrade affects several delegated administrators. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: KMS key ownership and rotation

Scenario: a workload team needs a temporary policy exception. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: KMS key ownership and rotation

Scenario: a new team must be onboarded without management-account access. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: KMS key ownership and rotation

Scenario: a logging destination policy is being hardened. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: KMS key ownership and rotation

Scenario: a network inspection change risks asymmetric routing. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: KMS key ownership and rotation

Scenario: a business-critical service needs a tested account exit path. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: KMS key ownership and rotation

Scenario: an organization plans to split a large workload OU. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: KMS key ownership and rotation

Scenario: an identity provider migration changes user lifecycle events. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: KMS key ownership and rotation

Scenario: a compliance rule is noisy and creates alert fatigue. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: KMS key ownership and rotation

Scenario: an incident requires evidence preservation across accounts. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: KMS key ownership and rotation

Scenario: a sandbox account needs automatic expiry and cleanup. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: KMS key ownership and rotation

Scenario: a partner integration requires narrowly scoped cross-account access. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: KMS key ownership and rotation

Scenario: a shared-service outage affects several application teams. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: KMS key ownership and rotation

Scenario: a new control must be introduced without blocking releases. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: KMS key ownership and rotation

Scenario: a legacy account uses an unsupported baseline customization. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: KMS key ownership and rotation

Scenario: a cost-sensitive team challenges centralized logging retention. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: KMS key ownership and rotation

Scenario: a regional service lacks the expected feature parity. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: KMS key ownership and rotation

Scenario: a security account needs a delegated service ownership transfer. For KMS key ownership and rotation, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for KMS key ownership and rotation. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for KMS key ownership and rotation

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for KMS key ownership and rotation is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for KMS key ownership and rotation without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for KMS key ownership and rotation without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for KMS key ownership and rotation without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For KMS key ownership and rotation, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for KMS key ownership and rotation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for KMS key ownership and rotation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for KMS key ownership and rotation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for KMS key ownership and rotation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for KMS key ownership and rotation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for KMS key ownership and rotation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for KMS key ownership and rotation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for KMS key ownership and rotation. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. KMS key ownership and rotation check 1: which evidence proves the design meets its constraint?
  2. KMS key ownership and rotation check 2: which evidence proves the design meets its constraint?
  3. KMS key ownership and rotation check 3: which evidence proves the design meets its constraint?
  4. KMS key ownership and rotation check 4: which evidence proves the design meets its constraint?
  5. KMS key ownership and rotation check 5: which evidence proves the design meets its constraint?
  6. KMS key ownership and rotation check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for KMS key ownership and rotation, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Backup policies and restore tests

AWS Landing Zone · Security Operations, Logging and Resilience · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Backup policies and restore tests: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • Backup policies and restore tests: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • Backup policies and restore tests: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Decision framework

For Backup policies and restore tests, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Backup policies and restore tests? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Backup policies and restore tests trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Backup policies and restore tests

Scenario: an acquisition brings three legacy AWS accounts. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Backup policies and restore tests

Scenario: a regulated payment workload must prove separation of duties. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Backup policies and restore tests

Scenario: a new Region is needed for data residency. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Backup policies and restore tests

Scenario: a business unit needs an isolated experimentation space. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Backup policies and restore tests

Scenario: a shared network team is moving from manual to managed routing. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Backup policies and restore tests

Scenario: an audit finds inconsistent evidence across accounts. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Backup policies and restore tests

Scenario: a security team must respond to a suspected credential leak. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Backup policies and restore tests

Scenario: a merger changes account ownership and support boundaries. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Backup policies and restore tests

Scenario: cost growth requires clearer shared-platform chargeback. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Backup policies and restore tests

Scenario: a production recovery test misses its target RTO. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Backup policies and restore tests

Scenario: a platform upgrade affects several delegated administrators. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Backup policies and restore tests

Scenario: a workload team needs a temporary policy exception. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Backup policies and restore tests

Scenario: a new team must be onboarded without management-account access. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Backup policies and restore tests

Scenario: a logging destination policy is being hardened. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Backup policies and restore tests

Scenario: a network inspection change risks asymmetric routing. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Backup policies and restore tests

Scenario: a business-critical service needs a tested account exit path. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Backup policies and restore tests

Scenario: an organization plans to split a large workload OU. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Backup policies and restore tests

Scenario: an identity provider migration changes user lifecycle events. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Backup policies and restore tests

Scenario: a compliance rule is noisy and creates alert fatigue. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Backup policies and restore tests

Scenario: an incident requires evidence preservation across accounts. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Backup policies and restore tests

Scenario: a sandbox account needs automatic expiry and cleanup. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Backup policies and restore tests

Scenario: a partner integration requires narrowly scoped cross-account access. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Backup policies and restore tests

Scenario: a shared-service outage affects several application teams. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Backup policies and restore tests

Scenario: a new control must be introduced without blocking releases. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Backup policies and restore tests

Scenario: a legacy account uses an unsupported baseline customization. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Backup policies and restore tests

Scenario: a cost-sensitive team challenges centralized logging retention. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Backup policies and restore tests

Scenario: a regional service lacks the expected feature parity. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Backup policies and restore tests

Scenario: a security account needs a delegated service ownership transfer. For Backup policies and restore tests, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Backup policies and restore tests. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Backup policies and restore tests

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Backup policies and restore tests is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Backup policies and restore tests without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Backup policies and restore tests without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Backup policies and restore tests without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Backup policies and restore tests, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Backup policies and restore tests. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Backup policies and restore tests. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Backup policies and restore tests. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Backup policies and restore tests. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Backup policies and restore tests. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Backup policies and restore tests. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Backup policies and restore tests. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Backup policies and restore tests. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Backup policies and restore tests check 1: which evidence proves the design meets its constraint?
  2. Backup policies and restore tests check 2: which evidence proves the design meets its constraint?
  3. Backup policies and restore tests check 3: which evidence proves the design meets its constraint?
  4. Backup policies and restore tests check 4: which evidence proves the design meets its constraint?
  5. Backup policies and restore tests check 5: which evidence proves the design meets its constraint?
  6. Backup policies and restore tests check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Backup policies and restore tests, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Incident response across accounts

AWS Landing Zone · Security Operations, Logging and Resilience · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Incident response across accounts: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • Incident response across accounts: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • Incident response across accounts: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Decision framework

For Incident response across accounts, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Incident response across accounts? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Incident response across accounts trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Incident response across accounts

Scenario: an acquisition brings three legacy AWS accounts. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Incident response across accounts

Scenario: a regulated payment workload must prove separation of duties. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Incident response across accounts

Scenario: a new Region is needed for data residency. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Incident response across accounts

Scenario: a business unit needs an isolated experimentation space. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Incident response across accounts

Scenario: a shared network team is moving from manual to managed routing. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Incident response across accounts

Scenario: an audit finds inconsistent evidence across accounts. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Incident response across accounts

Scenario: a security team must respond to a suspected credential leak. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Incident response across accounts

Scenario: a merger changes account ownership and support boundaries. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Incident response across accounts

Scenario: cost growth requires clearer shared-platform chargeback. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Incident response across accounts

Scenario: a production recovery test misses its target RTO. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Incident response across accounts

Scenario: a platform upgrade affects several delegated administrators. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Incident response across accounts

Scenario: a workload team needs a temporary policy exception. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Incident response across accounts

Scenario: a new team must be onboarded without management-account access. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Incident response across accounts

Scenario: a logging destination policy is being hardened. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Incident response across accounts

Scenario: a network inspection change risks asymmetric routing. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Incident response across accounts

Scenario: a business-critical service needs a tested account exit path. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Incident response across accounts

Scenario: an organization plans to split a large workload OU. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Incident response across accounts

Scenario: an identity provider migration changes user lifecycle events. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Incident response across accounts

Scenario: a compliance rule is noisy and creates alert fatigue. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Incident response across accounts

Scenario: an incident requires evidence preservation across accounts. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Incident response across accounts

Scenario: a sandbox account needs automatic expiry and cleanup. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Incident response across accounts

Scenario: a partner integration requires narrowly scoped cross-account access. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Incident response across accounts

Scenario: a shared-service outage affects several application teams. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Incident response across accounts

Scenario: a new control must be introduced without blocking releases. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Incident response across accounts

Scenario: a legacy account uses an unsupported baseline customization. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Incident response across accounts

Scenario: a cost-sensitive team challenges centralized logging retention. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Incident response across accounts

Scenario: a regional service lacks the expected feature parity. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Incident response across accounts

Scenario: a security account needs a delegated service ownership transfer. For Incident response across accounts, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Incident response across accounts. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Incident response across accounts

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Incident response across accounts is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Incident response across accounts without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Incident response across accounts without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Incident response across accounts without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Incident response across accounts, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Incident response across accounts. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Incident response across accounts. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Incident response across accounts. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Incident response across accounts. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Incident response across accounts. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Incident response across accounts. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Incident response across accounts. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Incident response across accounts. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Incident response across accounts check 1: which evidence proves the design meets its constraint?
  2. Incident response across accounts check 2: which evidence proves the design meets its constraint?
  3. Incident response across accounts check 3: which evidence proves the design meets its constraint?
  4. Incident response across accounts check 4: which evidence proves the design meets its constraint?
  5. Incident response across accounts check 5: which evidence proves the design meets its constraint?
  6. Incident response across accounts check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Incident response across accounts, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Log integrity lab

AWS Landing Zone · Security Operations, Logging and Resilience · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Log integrity lab: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • Log integrity lab: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • Log integrity lab: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Decision framework

For Log integrity lab, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Log integrity lab? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Log integrity lab trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Log integrity lab

Scenario: an acquisition brings three legacy AWS accounts. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Log integrity lab

Scenario: a regulated payment workload must prove separation of duties. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Log integrity lab

Scenario: a new Region is needed for data residency. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Log integrity lab

Scenario: a business unit needs an isolated experimentation space. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Log integrity lab

Scenario: a shared network team is moving from manual to managed routing. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Log integrity lab

Scenario: an audit finds inconsistent evidence across accounts. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Log integrity lab

Scenario: a security team must respond to a suspected credential leak. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Log integrity lab

Scenario: a merger changes account ownership and support boundaries. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Log integrity lab

Scenario: cost growth requires clearer shared-platform chargeback. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Log integrity lab

Scenario: a production recovery test misses its target RTO. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Log integrity lab

Scenario: a platform upgrade affects several delegated administrators. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Log integrity lab

Scenario: a workload team needs a temporary policy exception. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Log integrity lab

Scenario: a new team must be onboarded without management-account access. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Log integrity lab

Scenario: a logging destination policy is being hardened. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Log integrity lab

Scenario: a network inspection change risks asymmetric routing. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Log integrity lab

Scenario: a business-critical service needs a tested account exit path. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Log integrity lab

Scenario: an organization plans to split a large workload OU. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Log integrity lab

Scenario: an identity provider migration changes user lifecycle events. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Log integrity lab

Scenario: a compliance rule is noisy and creates alert fatigue. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Log integrity lab

Scenario: an incident requires evidence preservation across accounts. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Log integrity lab

Scenario: a sandbox account needs automatic expiry and cleanup. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Log integrity lab

Scenario: a partner integration requires narrowly scoped cross-account access. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Log integrity lab

Scenario: a shared-service outage affects several application teams. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Log integrity lab

Scenario: a new control must be introduced without blocking releases. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Log integrity lab

Scenario: a legacy account uses an unsupported baseline customization. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Log integrity lab

Scenario: a cost-sensitive team challenges centralized logging retention. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Log integrity lab

Scenario: a regional service lacks the expected feature parity. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Log integrity lab

Scenario: a security account needs a delegated service ownership transfer. For Log integrity lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Log integrity lab. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Log integrity lab

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Log integrity lab is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Log integrity lab without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Log integrity lab without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Log integrity lab without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Log integrity lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Log integrity lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Log integrity lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Log integrity lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Log integrity lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Log integrity lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Log integrity lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Log integrity lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Log integrity lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Log integrity lab check 1: which evidence proves the design meets its constraint?
  2. Log integrity lab check 2: which evidence proves the design meets its constraint?
  3. Log integrity lab check 3: which evidence proves the design meets its constraint?
  4. Log integrity lab check 4: which evidence proves the design meets its constraint?
  5. Log integrity lab check 5: which evidence proves the design meets its constraint?
  6. Log integrity lab check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Log integrity lab, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Recovery and escalation exercise

AWS Landing Zone · Security Operations, Logging and Resilience · 4 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Recovery and escalation exercise: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • Recovery and escalation exercise: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.
  • Recovery and escalation exercise: Explain its boundaries, accountable owner, risk and trade-offs; Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Decision framework

For Recovery and escalation exercise, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Recovery and escalation exercise? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Recovery and escalation exercise trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Recovery and escalation exercise

Scenario: an acquisition brings three legacy AWS accounts. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Recovery and escalation exercise

Scenario: a regulated payment workload must prove separation of duties. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Recovery and escalation exercise

Scenario: a new Region is needed for data residency. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Recovery and escalation exercise

Scenario: a business unit needs an isolated experimentation space. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Recovery and escalation exercise

Scenario: a shared network team is moving from manual to managed routing. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Recovery and escalation exercise

Scenario: an audit finds inconsistent evidence across accounts. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Recovery and escalation exercise

Scenario: a security team must respond to a suspected credential leak. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Recovery and escalation exercise

Scenario: a merger changes account ownership and support boundaries. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Recovery and escalation exercise

Scenario: cost growth requires clearer shared-platform chargeback. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Recovery and escalation exercise

Scenario: a production recovery test misses its target RTO. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Recovery and escalation exercise

Scenario: a platform upgrade affects several delegated administrators. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Recovery and escalation exercise

Scenario: a workload team needs a temporary policy exception. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Recovery and escalation exercise

Scenario: a new team must be onboarded without management-account access. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Recovery and escalation exercise

Scenario: a logging destination policy is being hardened. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Recovery and escalation exercise

Scenario: a network inspection change risks asymmetric routing. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Recovery and escalation exercise

Scenario: a business-critical service needs a tested account exit path. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Recovery and escalation exercise

Scenario: an organization plans to split a large workload OU. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Recovery and escalation exercise

Scenario: an identity provider migration changes user lifecycle events. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Recovery and escalation exercise

Scenario: a compliance rule is noisy and creates alert fatigue. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Recovery and escalation exercise

Scenario: an incident requires evidence preservation across accounts. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Recovery and escalation exercise

Scenario: a sandbox account needs automatic expiry and cleanup. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Recovery and escalation exercise

Scenario: a partner integration requires narrowly scoped cross-account access. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Recovery and escalation exercise

Scenario: a shared-service outage affects several application teams. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Recovery and escalation exercise

Scenario: a new control must be introduced without blocking releases. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Recovery and escalation exercise

Scenario: a legacy account uses an unsupported baseline customization. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Recovery and escalation exercise

Scenario: a cost-sensitive team challenges centralized logging retention. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Recovery and escalation exercise

Scenario: a regional service lacks the expected feature parity. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Recovery and escalation exercise

Scenario: a security account needs a delegated service ownership transfer. For Recovery and escalation exercise, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Recovery and escalation exercise. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Recovery and escalation exercise

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Recovery and escalation exercise is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Recovery and escalation exercise without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Recovery and escalation exercise without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Recovery and escalation exercise without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Recovery and escalation exercise, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Recovery and escalation exercise. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Recovery and escalation exercise. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Recovery and escalation exercise. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Recovery and escalation exercise. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Recovery and escalation exercise. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Recovery and escalation exercise. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Recovery and escalation exercise. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Recovery and escalation exercise. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Recovery and escalation exercise check 1: which evidence proves the design meets its constraint?
  2. Recovery and escalation exercise check 2: which evidence proves the design meets its constraint?
  3. Recovery and escalation exercise check 3: which evidence proves the design meets its constraint?
  4. Recovery and escalation exercise check 4: which evidence proves the design meets its constraint?
  5. Recovery and escalation exercise check 5: which evidence proves the design meets its constraint?
  6. Recovery and escalation exercise check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Recovery and escalation exercise, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Field checklist / 实战清单

Organization CloudTrail and log archive

Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

AWS Config and evidence retention

Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

GuardDuty and Security Hub

Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

KMS key ownership and rotation

Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Backup policies and restore tests

Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Incident response across accounts

Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Log integrity lab

Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Recovery and escalation exercise

Centralize audit evidence and security findings, protect logs and keys, and design backup and incident response operations.

Official references / 官方参考