English original · Authoritative AWS references are linked in each module.

Automation, Provisioning and Evolution

Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
AWS Control TowerOrganizationsEnglish original · Authoritative AWS references are linked in each module.
Learning outcomes / 学习成果
  • IaC boundaries and repository model — apply to a safe, reviewable architecture decision
  • Landing Zone Accelerator pipeline — apply to a safe, reviewable architecture decision
  • AFT lifecycle and customization — apply to a safe, reviewable architecture decision
  • Pipeline roles and trust — apply to a safe, reviewable architecture decision
  • Drift, upgrades and release gates — apply to a safe, reviewable architecture decision
  • Migration waves and adoption — apply to a safe, reviewable architecture decision
  • Change simulation lab — apply to a safe, reviewable architecture decision
  • Operating model review — apply to a safe, reviewable architecture decision

Schedule / 课程安排

#Module / 模块Minutes / 分钟
1IaC boundaries and repository model8
2Landing Zone Accelerator pipeline8
3AFT lifecycle and customization8
4Pipeline roles and trust8
5Drift, upgrades and release gates8
6Migration waves and adoption8
7Change simulation lab8
8Operating model review4
Use read-only discovery unless you have an explicitly authorized sandbox. Organization-wide controls can affect every member account.
Start / 开始 →

IaC boundaries and repository model

AWS Landing Zone · Automation, Provisioning and Evolution · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • IaC boundaries and repository model: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • IaC boundaries and repository model: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • IaC boundaries and repository model: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Decision framework

For IaC boundaries and repository model, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns IaC boundaries and repository model? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

IaC boundaries and repository model trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: IaC boundaries and repository model

Scenario: an acquisition brings three legacy AWS accounts. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: IaC boundaries and repository model

Scenario: a regulated payment workload must prove separation of duties. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: IaC boundaries and repository model

Scenario: a new Region is needed for data residency. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: IaC boundaries and repository model

Scenario: a business unit needs an isolated experimentation space. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: IaC boundaries and repository model

Scenario: a shared network team is moving from manual to managed routing. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: IaC boundaries and repository model

Scenario: an audit finds inconsistent evidence across accounts. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: IaC boundaries and repository model

Scenario: a security team must respond to a suspected credential leak. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: IaC boundaries and repository model

Scenario: a merger changes account ownership and support boundaries. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: IaC boundaries and repository model

Scenario: cost growth requires clearer shared-platform chargeback. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: IaC boundaries and repository model

Scenario: a production recovery test misses its target RTO. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: IaC boundaries and repository model

Scenario: a platform upgrade affects several delegated administrators. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: IaC boundaries and repository model

Scenario: a workload team needs a temporary policy exception. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: IaC boundaries and repository model

Scenario: a new team must be onboarded without management-account access. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: IaC boundaries and repository model

Scenario: a logging destination policy is being hardened. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: IaC boundaries and repository model

Scenario: a network inspection change risks asymmetric routing. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: IaC boundaries and repository model

Scenario: a business-critical service needs a tested account exit path. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: IaC boundaries and repository model

Scenario: an organization plans to split a large workload OU. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: IaC boundaries and repository model

Scenario: an identity provider migration changes user lifecycle events. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: IaC boundaries and repository model

Scenario: a compliance rule is noisy and creates alert fatigue. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: IaC boundaries and repository model

Scenario: an incident requires evidence preservation across accounts. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: IaC boundaries and repository model

Scenario: a sandbox account needs automatic expiry and cleanup. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: IaC boundaries and repository model

Scenario: a partner integration requires narrowly scoped cross-account access. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: IaC boundaries and repository model

Scenario: a shared-service outage affects several application teams. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: IaC boundaries and repository model

Scenario: a new control must be introduced without blocking releases. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: IaC boundaries and repository model

Scenario: a legacy account uses an unsupported baseline customization. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: IaC boundaries and repository model

Scenario: a cost-sensitive team challenges centralized logging retention. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: IaC boundaries and repository model

Scenario: a regional service lacks the expected feature parity. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: IaC boundaries and repository model

Scenario: a security account needs a delegated service ownership transfer. For IaC boundaries and repository model, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for IaC boundaries and repository model. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for IaC boundaries and repository model

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for IaC boundaries and repository model is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for IaC boundaries and repository model without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for IaC boundaries and repository model without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for IaC boundaries and repository model without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For IaC boundaries and repository model, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for IaC boundaries and repository model. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for IaC boundaries and repository model. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for IaC boundaries and repository model. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for IaC boundaries and repository model. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for IaC boundaries and repository model. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for IaC boundaries and repository model. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for IaC boundaries and repository model. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for IaC boundaries and repository model. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. IaC boundaries and repository model check 1: which evidence proves the design meets its constraint?
  2. IaC boundaries and repository model check 2: which evidence proves the design meets its constraint?
  3. IaC boundaries and repository model check 3: which evidence proves the design meets its constraint?
  4. IaC boundaries and repository model check 4: which evidence proves the design meets its constraint?
  5. IaC boundaries and repository model check 5: which evidence proves the design meets its constraint?
  6. IaC boundaries and repository model check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for IaC boundaries and repository model, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Landing Zone Accelerator pipeline

AWS Landing Zone · Automation, Provisioning and Evolution · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Landing Zone Accelerator pipeline: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Landing Zone Accelerator pipeline: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Landing Zone Accelerator pipeline: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Decision framework

For Landing Zone Accelerator pipeline, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Landing Zone Accelerator pipeline? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Landing Zone Accelerator pipeline trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Landing Zone Accelerator pipeline

Scenario: an acquisition brings three legacy AWS accounts. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Landing Zone Accelerator pipeline

Scenario: a regulated payment workload must prove separation of duties. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Landing Zone Accelerator pipeline

Scenario: a new Region is needed for data residency. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Landing Zone Accelerator pipeline

Scenario: a business unit needs an isolated experimentation space. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Landing Zone Accelerator pipeline

Scenario: a shared network team is moving from manual to managed routing. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Landing Zone Accelerator pipeline

Scenario: an audit finds inconsistent evidence across accounts. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Landing Zone Accelerator pipeline

Scenario: a security team must respond to a suspected credential leak. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Landing Zone Accelerator pipeline

Scenario: a merger changes account ownership and support boundaries. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Landing Zone Accelerator pipeline

Scenario: cost growth requires clearer shared-platform chargeback. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Landing Zone Accelerator pipeline

Scenario: a production recovery test misses its target RTO. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Landing Zone Accelerator pipeline

Scenario: a platform upgrade affects several delegated administrators. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Landing Zone Accelerator pipeline

Scenario: a workload team needs a temporary policy exception. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Landing Zone Accelerator pipeline

Scenario: a new team must be onboarded without management-account access. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Landing Zone Accelerator pipeline

Scenario: a logging destination policy is being hardened. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Landing Zone Accelerator pipeline

Scenario: a network inspection change risks asymmetric routing. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Landing Zone Accelerator pipeline

Scenario: a business-critical service needs a tested account exit path. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Landing Zone Accelerator pipeline

Scenario: an organization plans to split a large workload OU. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Landing Zone Accelerator pipeline

Scenario: an identity provider migration changes user lifecycle events. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Landing Zone Accelerator pipeline

Scenario: a compliance rule is noisy and creates alert fatigue. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Landing Zone Accelerator pipeline

Scenario: an incident requires evidence preservation across accounts. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Landing Zone Accelerator pipeline

Scenario: a sandbox account needs automatic expiry and cleanup. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Landing Zone Accelerator pipeline

Scenario: a partner integration requires narrowly scoped cross-account access. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Landing Zone Accelerator pipeline

Scenario: a shared-service outage affects several application teams. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Landing Zone Accelerator pipeline

Scenario: a new control must be introduced without blocking releases. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Landing Zone Accelerator pipeline

Scenario: a legacy account uses an unsupported baseline customization. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Landing Zone Accelerator pipeline

Scenario: a cost-sensitive team challenges centralized logging retention. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Landing Zone Accelerator pipeline

Scenario: a regional service lacks the expected feature parity. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Landing Zone Accelerator pipeline

Scenario: a security account needs a delegated service ownership transfer. For Landing Zone Accelerator pipeline, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Landing Zone Accelerator pipeline. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Landing Zone Accelerator pipeline

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Landing Zone Accelerator pipeline is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Landing Zone Accelerator pipeline without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Landing Zone Accelerator pipeline without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Landing Zone Accelerator pipeline without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Landing Zone Accelerator pipeline, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Landing Zone Accelerator pipeline. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Landing Zone Accelerator pipeline. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Landing Zone Accelerator pipeline. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Landing Zone Accelerator pipeline. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Landing Zone Accelerator pipeline. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Landing Zone Accelerator pipeline. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Landing Zone Accelerator pipeline. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Landing Zone Accelerator pipeline. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Landing Zone Accelerator pipeline check 1: which evidence proves the design meets its constraint?
  2. Landing Zone Accelerator pipeline check 2: which evidence proves the design meets its constraint?
  3. Landing Zone Accelerator pipeline check 3: which evidence proves the design meets its constraint?
  4. Landing Zone Accelerator pipeline check 4: which evidence proves the design meets its constraint?
  5. Landing Zone Accelerator pipeline check 5: which evidence proves the design meets its constraint?
  6. Landing Zone Accelerator pipeline check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Landing Zone Accelerator pipeline, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

AFT lifecycle and customization

AWS Landing Zone · Automation, Provisioning and Evolution · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • AFT lifecycle and customization: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • AFT lifecycle and customization: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • AFT lifecycle and customization: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Decision framework

For AFT lifecycle and customization, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns AFT lifecycle and customization? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

AFT lifecycle and customization trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: AFT lifecycle and customization

Scenario: an acquisition brings three legacy AWS accounts. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: AFT lifecycle and customization

Scenario: a regulated payment workload must prove separation of duties. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: AFT lifecycle and customization

Scenario: a new Region is needed for data residency. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: AFT lifecycle and customization

Scenario: a business unit needs an isolated experimentation space. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: AFT lifecycle and customization

Scenario: a shared network team is moving from manual to managed routing. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: AFT lifecycle and customization

Scenario: an audit finds inconsistent evidence across accounts. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: AFT lifecycle and customization

Scenario: a security team must respond to a suspected credential leak. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: AFT lifecycle and customization

Scenario: a merger changes account ownership and support boundaries. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: AFT lifecycle and customization

Scenario: cost growth requires clearer shared-platform chargeback. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: AFT lifecycle and customization

Scenario: a production recovery test misses its target RTO. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: AFT lifecycle and customization

Scenario: a platform upgrade affects several delegated administrators. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: AFT lifecycle and customization

Scenario: a workload team needs a temporary policy exception. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: AFT lifecycle and customization

Scenario: a new team must be onboarded without management-account access. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: AFT lifecycle and customization

Scenario: a logging destination policy is being hardened. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: AFT lifecycle and customization

Scenario: a network inspection change risks asymmetric routing. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: AFT lifecycle and customization

Scenario: a business-critical service needs a tested account exit path. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: AFT lifecycle and customization

Scenario: an organization plans to split a large workload OU. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: AFT lifecycle and customization

Scenario: an identity provider migration changes user lifecycle events. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: AFT lifecycle and customization

Scenario: a compliance rule is noisy and creates alert fatigue. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: AFT lifecycle and customization

Scenario: an incident requires evidence preservation across accounts. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: AFT lifecycle and customization

Scenario: a sandbox account needs automatic expiry and cleanup. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: AFT lifecycle and customization

Scenario: a partner integration requires narrowly scoped cross-account access. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: AFT lifecycle and customization

Scenario: a shared-service outage affects several application teams. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: AFT lifecycle and customization

Scenario: a new control must be introduced without blocking releases. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: AFT lifecycle and customization

Scenario: a legacy account uses an unsupported baseline customization. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: AFT lifecycle and customization

Scenario: a cost-sensitive team challenges centralized logging retention. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: AFT lifecycle and customization

Scenario: a regional service lacks the expected feature parity. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: AFT lifecycle and customization

Scenario: a security account needs a delegated service ownership transfer. For AFT lifecycle and customization, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for AFT lifecycle and customization. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for AFT lifecycle and customization

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for AFT lifecycle and customization is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for AFT lifecycle and customization without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for AFT lifecycle and customization without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for AFT lifecycle and customization without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For AFT lifecycle and customization, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for AFT lifecycle and customization. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for AFT lifecycle and customization. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for AFT lifecycle and customization. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for AFT lifecycle and customization. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for AFT lifecycle and customization. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for AFT lifecycle and customization. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for AFT lifecycle and customization. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for AFT lifecycle and customization. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. AFT lifecycle and customization check 1: which evidence proves the design meets its constraint?
  2. AFT lifecycle and customization check 2: which evidence proves the design meets its constraint?
  3. AFT lifecycle and customization check 3: which evidence proves the design meets its constraint?
  4. AFT lifecycle and customization check 4: which evidence proves the design meets its constraint?
  5. AFT lifecycle and customization check 5: which evidence proves the design meets its constraint?
  6. AFT lifecycle and customization check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for AFT lifecycle and customization, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Pipeline roles and trust

AWS Landing Zone · Automation, Provisioning and Evolution · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Pipeline roles and trust: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Pipeline roles and trust: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Pipeline roles and trust: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Decision framework

For Pipeline roles and trust, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Pipeline roles and trust? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Pipeline roles and trust trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Pipeline roles and trust

Scenario: an acquisition brings three legacy AWS accounts. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Pipeline roles and trust

Scenario: a regulated payment workload must prove separation of duties. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Pipeline roles and trust

Scenario: a new Region is needed for data residency. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Pipeline roles and trust

Scenario: a business unit needs an isolated experimentation space. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Pipeline roles and trust

Scenario: a shared network team is moving from manual to managed routing. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Pipeline roles and trust

Scenario: an audit finds inconsistent evidence across accounts. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Pipeline roles and trust

Scenario: a security team must respond to a suspected credential leak. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Pipeline roles and trust

Scenario: a merger changes account ownership and support boundaries. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Pipeline roles and trust

Scenario: cost growth requires clearer shared-platform chargeback. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Pipeline roles and trust

Scenario: a production recovery test misses its target RTO. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Pipeline roles and trust

Scenario: a platform upgrade affects several delegated administrators. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Pipeline roles and trust

Scenario: a workload team needs a temporary policy exception. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Pipeline roles and trust

Scenario: a new team must be onboarded without management-account access. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Pipeline roles and trust

Scenario: a logging destination policy is being hardened. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Pipeline roles and trust

Scenario: a network inspection change risks asymmetric routing. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Pipeline roles and trust

Scenario: a business-critical service needs a tested account exit path. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Pipeline roles and trust

Scenario: an organization plans to split a large workload OU. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Pipeline roles and trust

Scenario: an identity provider migration changes user lifecycle events. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Pipeline roles and trust

Scenario: a compliance rule is noisy and creates alert fatigue. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Pipeline roles and trust

Scenario: an incident requires evidence preservation across accounts. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Pipeline roles and trust

Scenario: a sandbox account needs automatic expiry and cleanup. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Pipeline roles and trust

Scenario: a partner integration requires narrowly scoped cross-account access. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Pipeline roles and trust

Scenario: a shared-service outage affects several application teams. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Pipeline roles and trust

Scenario: a new control must be introduced without blocking releases. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Pipeline roles and trust

Scenario: a legacy account uses an unsupported baseline customization. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Pipeline roles and trust

Scenario: a cost-sensitive team challenges centralized logging retention. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Pipeline roles and trust

Scenario: a regional service lacks the expected feature parity. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Pipeline roles and trust

Scenario: a security account needs a delegated service ownership transfer. For Pipeline roles and trust, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Pipeline roles and trust. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Pipeline roles and trust

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Pipeline roles and trust is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Pipeline roles and trust without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Pipeline roles and trust without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Pipeline roles and trust without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Pipeline roles and trust, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Pipeline roles and trust. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Pipeline roles and trust. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Pipeline roles and trust. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Pipeline roles and trust. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Pipeline roles and trust. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Pipeline roles and trust. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Pipeline roles and trust. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Pipeline roles and trust. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Pipeline roles and trust check 1: which evidence proves the design meets its constraint?
  2. Pipeline roles and trust check 2: which evidence proves the design meets its constraint?
  3. Pipeline roles and trust check 3: which evidence proves the design meets its constraint?
  4. Pipeline roles and trust check 4: which evidence proves the design meets its constraint?
  5. Pipeline roles and trust check 5: which evidence proves the design meets its constraint?
  6. Pipeline roles and trust check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Pipeline roles and trust, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Drift, upgrades and release gates

AWS Landing Zone · Automation, Provisioning and Evolution · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Drift, upgrades and release gates: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Drift, upgrades and release gates: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Drift, upgrades and release gates: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Decision framework

For Drift, upgrades and release gates, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Drift, upgrades and release gates? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Drift, upgrades and release gates trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Drift, upgrades and release gates

Scenario: an acquisition brings three legacy AWS accounts. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Drift, upgrades and release gates

Scenario: a regulated payment workload must prove separation of duties. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Drift, upgrades and release gates

Scenario: a new Region is needed for data residency. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Drift, upgrades and release gates

Scenario: a business unit needs an isolated experimentation space. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Drift, upgrades and release gates

Scenario: a shared network team is moving from manual to managed routing. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Drift, upgrades and release gates

Scenario: an audit finds inconsistent evidence across accounts. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Drift, upgrades and release gates

Scenario: a security team must respond to a suspected credential leak. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Drift, upgrades and release gates

Scenario: a merger changes account ownership and support boundaries. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Drift, upgrades and release gates

Scenario: cost growth requires clearer shared-platform chargeback. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Drift, upgrades and release gates

Scenario: a production recovery test misses its target RTO. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Drift, upgrades and release gates

Scenario: a platform upgrade affects several delegated administrators. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Drift, upgrades and release gates

Scenario: a workload team needs a temporary policy exception. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Drift, upgrades and release gates

Scenario: a new team must be onboarded without management-account access. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Drift, upgrades and release gates

Scenario: a logging destination policy is being hardened. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Drift, upgrades and release gates

Scenario: a network inspection change risks asymmetric routing. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Drift, upgrades and release gates

Scenario: a business-critical service needs a tested account exit path. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Drift, upgrades and release gates

Scenario: an organization plans to split a large workload OU. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Drift, upgrades and release gates

Scenario: an identity provider migration changes user lifecycle events. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Drift, upgrades and release gates

Scenario: a compliance rule is noisy and creates alert fatigue. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Drift, upgrades and release gates

Scenario: an incident requires evidence preservation across accounts. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Drift, upgrades and release gates

Scenario: a sandbox account needs automatic expiry and cleanup. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Drift, upgrades and release gates

Scenario: a partner integration requires narrowly scoped cross-account access. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Drift, upgrades and release gates

Scenario: a shared-service outage affects several application teams. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Drift, upgrades and release gates

Scenario: a new control must be introduced without blocking releases. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Drift, upgrades and release gates

Scenario: a legacy account uses an unsupported baseline customization. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Drift, upgrades and release gates

Scenario: a cost-sensitive team challenges centralized logging retention. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Drift, upgrades and release gates

Scenario: a regional service lacks the expected feature parity. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Drift, upgrades and release gates

Scenario: a security account needs a delegated service ownership transfer. For Drift, upgrades and release gates, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Drift, upgrades and release gates. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Drift, upgrades and release gates

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Drift, upgrades and release gates is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Drift, upgrades and release gates without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Drift, upgrades and release gates without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Drift, upgrades and release gates without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Drift, upgrades and release gates, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Drift, upgrades and release gates. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Drift, upgrades and release gates. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Drift, upgrades and release gates. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Drift, upgrades and release gates. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Drift, upgrades and release gates. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Drift, upgrades and release gates. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Drift, upgrades and release gates. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Drift, upgrades and release gates. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Drift, upgrades and release gates check 1: which evidence proves the design meets its constraint?
  2. Drift, upgrades and release gates check 2: which evidence proves the design meets its constraint?
  3. Drift, upgrades and release gates check 3: which evidence proves the design meets its constraint?
  4. Drift, upgrades and release gates check 4: which evidence proves the design meets its constraint?
  5. Drift, upgrades and release gates check 5: which evidence proves the design meets its constraint?
  6. Drift, upgrades and release gates check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Drift, upgrades and release gates, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Migration waves and adoption

AWS Landing Zone · Automation, Provisioning and Evolution · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Migration waves and adoption: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Migration waves and adoption: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Migration waves and adoption: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Decision framework

For Migration waves and adoption, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Migration waves and adoption? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Migration waves and adoption trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Migration waves and adoption

Scenario: an acquisition brings three legacy AWS accounts. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Migration waves and adoption

Scenario: a regulated payment workload must prove separation of duties. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Migration waves and adoption

Scenario: a new Region is needed for data residency. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Migration waves and adoption

Scenario: a business unit needs an isolated experimentation space. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Migration waves and adoption

Scenario: a shared network team is moving from manual to managed routing. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Migration waves and adoption

Scenario: an audit finds inconsistent evidence across accounts. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Migration waves and adoption

Scenario: a security team must respond to a suspected credential leak. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Migration waves and adoption

Scenario: a merger changes account ownership and support boundaries. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Migration waves and adoption

Scenario: cost growth requires clearer shared-platform chargeback. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Migration waves and adoption

Scenario: a production recovery test misses its target RTO. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Migration waves and adoption

Scenario: a platform upgrade affects several delegated administrators. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Migration waves and adoption

Scenario: a workload team needs a temporary policy exception. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Migration waves and adoption

Scenario: a new team must be onboarded without management-account access. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Migration waves and adoption

Scenario: a logging destination policy is being hardened. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Migration waves and adoption

Scenario: a network inspection change risks asymmetric routing. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Migration waves and adoption

Scenario: a business-critical service needs a tested account exit path. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Migration waves and adoption

Scenario: an organization plans to split a large workload OU. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Migration waves and adoption

Scenario: an identity provider migration changes user lifecycle events. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Migration waves and adoption

Scenario: a compliance rule is noisy and creates alert fatigue. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Migration waves and adoption

Scenario: an incident requires evidence preservation across accounts. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Migration waves and adoption

Scenario: a sandbox account needs automatic expiry and cleanup. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Migration waves and adoption

Scenario: a partner integration requires narrowly scoped cross-account access. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Migration waves and adoption

Scenario: a shared-service outage affects several application teams. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Migration waves and adoption

Scenario: a new control must be introduced without blocking releases. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Migration waves and adoption

Scenario: a legacy account uses an unsupported baseline customization. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Migration waves and adoption

Scenario: a cost-sensitive team challenges centralized logging retention. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Migration waves and adoption

Scenario: a regional service lacks the expected feature parity. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Migration waves and adoption

Scenario: a security account needs a delegated service ownership transfer. For Migration waves and adoption, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Migration waves and adoption. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Migration waves and adoption

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Migration waves and adoption is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Migration waves and adoption without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Migration waves and adoption without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Migration waves and adoption without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Migration waves and adoption, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Migration waves and adoption. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Migration waves and adoption. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Migration waves and adoption. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Migration waves and adoption. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Migration waves and adoption. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Migration waves and adoption. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Migration waves and adoption. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Migration waves and adoption. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Migration waves and adoption check 1: which evidence proves the design meets its constraint?
  2. Migration waves and adoption check 2: which evidence proves the design meets its constraint?
  3. Migration waves and adoption check 3: which evidence proves the design meets its constraint?
  4. Migration waves and adoption check 4: which evidence proves the design meets its constraint?
  5. Migration waves and adoption check 5: which evidence proves the design meets its constraint?
  6. Migration waves and adoption check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Migration waves and adoption, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Change simulation lab

AWS Landing Zone · Automation, Provisioning and Evolution · 8 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Change simulation lab: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Change simulation lab: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Change simulation lab: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Decision framework

For Change simulation lab, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Change simulation lab? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Change simulation lab trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Change simulation lab

Scenario: an acquisition brings three legacy AWS accounts. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Change simulation lab

Scenario: a regulated payment workload must prove separation of duties. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Change simulation lab

Scenario: a new Region is needed for data residency. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Change simulation lab

Scenario: a business unit needs an isolated experimentation space. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Change simulation lab

Scenario: a shared network team is moving from manual to managed routing. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Change simulation lab

Scenario: an audit finds inconsistent evidence across accounts. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Change simulation lab

Scenario: a security team must respond to a suspected credential leak. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Change simulation lab

Scenario: a merger changes account ownership and support boundaries. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Change simulation lab

Scenario: cost growth requires clearer shared-platform chargeback. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Change simulation lab

Scenario: a production recovery test misses its target RTO. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Change simulation lab

Scenario: a platform upgrade affects several delegated administrators. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Change simulation lab

Scenario: a workload team needs a temporary policy exception. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Change simulation lab

Scenario: a new team must be onboarded without management-account access. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Change simulation lab

Scenario: a logging destination policy is being hardened. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Change simulation lab

Scenario: a network inspection change risks asymmetric routing. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Change simulation lab

Scenario: a business-critical service needs a tested account exit path. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Change simulation lab

Scenario: an organization plans to split a large workload OU. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Change simulation lab

Scenario: an identity provider migration changes user lifecycle events. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Change simulation lab

Scenario: a compliance rule is noisy and creates alert fatigue. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Change simulation lab

Scenario: an incident requires evidence preservation across accounts. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Change simulation lab

Scenario: a sandbox account needs automatic expiry and cleanup. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Change simulation lab

Scenario: a partner integration requires narrowly scoped cross-account access. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Change simulation lab

Scenario: a shared-service outage affects several application teams. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Change simulation lab

Scenario: a new control must be introduced without blocking releases. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Change simulation lab

Scenario: a legacy account uses an unsupported baseline customization. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Change simulation lab

Scenario: a cost-sensitive team challenges centralized logging retention. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Change simulation lab

Scenario: a regional service lacks the expected feature parity. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Change simulation lab

Scenario: a security account needs a delegated service ownership transfer. For Change simulation lab, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Change simulation lab. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Change simulation lab

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Change simulation lab is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Change simulation lab without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Change simulation lab without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Change simulation lab without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Change simulation lab, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Change simulation lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Change simulation lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Change simulation lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Change simulation lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Change simulation lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Change simulation lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Change simulation lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Change simulation lab. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Change simulation lab check 1: which evidence proves the design meets its constraint?
  2. Change simulation lab check 2: which evidence proves the design meets its constraint?
  3. Change simulation lab check 3: which evidence proves the design meets its constraint?
  4. Change simulation lab check 4: which evidence proves the design meets its constraint?
  5. Change simulation lab check 5: which evidence proves the design meets its constraint?
  6. Change simulation lab check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Change simulation lab, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Operating model review

AWS Landing Zone · Automation, Provisioning and Evolution · 4 min
AWS OrganizationsControl TowerEnglish original / EN–中文

Learning objectives

  • Operating model review: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Operating model review: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.
  • Operating model review: Explain its boundaries, accountable owner, risk and trade-offs; Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Decision framework

For Operating model review, record the outcome, constraints, alternatives, risks, decision owner and evidence. Separate platform-team responsibilities from workload-account ownership; assess blast radius before planning phased implementation.

Key design questions

Who owns Operating model review? How are duties divided between the management account, delegated administrators and member accounts? How is drift detected? Who approves exceptions and rollback? What evidence proves the control is effective?

Operating model review trade-offs

Compare central management with account autonomy, standardization with team flexibility, rapid vending with change review, and global enforcement with auditable exceptions. State cost, operational burden, failure domain and exit path for each choice.

Workshop 1: Operating model review

Scenario: an acquisition brings three legacy AWS accounts. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 2: Operating model review

Scenario: a regulated payment workload must prove separation of duties. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 3: Operating model review

Scenario: a new Region is needed for data residency. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 4: Operating model review

Scenario: a business unit needs an isolated experimentation space. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 5: Operating model review

Scenario: a shared network team is moving from manual to managed routing. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 6: Operating model review

Scenario: an audit finds inconsistent evidence across accounts. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 7: Operating model review

Scenario: a security team must respond to a suspected credential leak. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 8: Operating model review

Scenario: a merger changes account ownership and support boundaries. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 9: Operating model review

Scenario: cost growth requires clearer shared-platform chargeback. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 10: Operating model review

Scenario: a production recovery test misses its target RTO. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 11: Operating model review

Scenario: a platform upgrade affects several delegated administrators. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 12: Operating model review

Scenario: a workload team needs a temporary policy exception. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 13: Operating model review

Scenario: a new team must be onboarded without management-account access. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 14: Operating model review

Scenario: a logging destination policy is being hardened. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 15: Operating model review

Scenario: a network inspection change risks asymmetric routing. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 16: Operating model review

Scenario: a business-critical service needs a tested account exit path. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 17: Operating model review

Scenario: an organization plans to split a large workload OU. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 18: Operating model review

Scenario: an identity provider migration changes user lifecycle events. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 19: Operating model review

Scenario: a compliance rule is noisy and creates alert fatigue. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 20: Operating model review

Scenario: an incident requires evidence preservation across accounts. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Workshop 21: Operating model review

Scenario: a sandbox account needs automatic expiry and cleanup. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a time-bound exception record and compensating-control validation. Have another group identify one failure mode and one test that could disprove the design.

Workshop 22: Operating model review

Scenario: a partner integration requires narrowly scoped cross-account access. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an account lifecycle and cost-ownership plan. Have another group identify one failure mode and one test that could disprove the design.

Workshop 23: Operating model review

Scenario: a shared-service outage affects several application teams. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a drift-detection and audit-evidence checklist. Have another group identify one failure mode and one test that could disprove the design.

Workshop 24: Operating model review

Scenario: a new control must be introduced without blocking releases. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a migration sequence with prerequisites and stop conditions. Have another group identify one failure mode and one test that could disprove the design.

Workshop 25: Operating model review

Scenario: a legacy account uses an unsupported baseline customization. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: an approved decision record and explicit ownership map. Have another group identify one failure mode and one test that could disprove the design.

Workshop 26: Operating model review

Scenario: a cost-sensitive team challenges centralized logging retention. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a staged canary plan with measurable entry and exit criteria. Have another group identify one failure mode and one test that could disprove the design.

Workshop 27: Operating model review

Scenario: a regional service lacks the expected feature parity. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a threat and failure-mode review with evidence sources. Have another group identify one failure mode and one test that could disprove the design.

Workshop 28: Operating model review

Scenario: a security account needs a delegated service ownership transfer. For Operating model review, inventory facts, unverified assumptions, affected accounts and business owners; state non-negotiable security/compliance constraints, dependent teams, worst failure and customer impact. Design target and transitional states; name decision account, execution role, change path, metric, audit evidence, rollback threshold and owner. Deliverable: a tested recovery or rollback runbook with accountable operators. Have another group identify one failure mode and one test that could disprove the design.

Logical architecture

Management account → Security OU (Audit / Log Archive) → Infrastructure OU (Network / Shared Services) → Workload OUs → account-level baselines

Arrows show hierarchy and ownership boundaries; they do not imply network access.

Read the diagram

Mark the configuration source, execution plane, evidence plane and containment boundary for Operating model review. Trace one member-account change: approver, delivery pipeline, observation point and recovery owner.

Architecture change sequence

1. Inventory current state and constraints for Operating model review

2. Validate in a non-production account

3. Deploy to a small cohort and observe

4. Review evidence and exceptions

5. Expand or rollback against explicit gates

Use read-only inventory commands; configure CLI only for an authorized sandbox account.

aws sts get-caller-identity
aws organizations describe-organization
aws organizations list-roots
aws organizations list-accounts --query "Accounts[].{Id:Id,Name:Name,Status:Status}"
aws controltower list-enabled-controls --target-identifier arn:aws:organizations::123456789012:ou/o-example/ou-example
aws configservice describe-configuration-recorders --region us-east-1

Command interpretation / 命令解读

Before execution, verify caller identity, partition, Region and target account. Inventory for Operating model review is a point-in-time view; pagination, access denial, uninitialized services and regional differences can look like missing data. Retain raw output with timestamp, principal and filters.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Operating model review without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Operating model review without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Guided, non-destructive lab / 指导式只读实验

Goal: produce a gap register for Operating model review without organization-wide writes. Steps: (1) select an authorized read-only sandbox; (2) record caller identity; (3) export organization, OU, account and control state; (4) compare with target baseline; (5) mark unknowns instead of guessing; (6) assign an owner, evidence and change window to material gaps. Deliver: diagram, risk register, decision record and validation plan.

Acceptance rubric / 验收标准

Pass when every gap has factual evidence, blast radius, severity, proposed owner and verification method; alternatives are explained; no unauthorized writes occur; and open assumptions are explicit.

Production review 1

Production review scenario: cost growth requires clearer shared-platform chargeback. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a threat and failure-mode review with evidence sources as evidence.

Production review 2

Production review scenario: a production recovery test misses its target RTO. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a tested recovery or rollback runbook with accountable operators as evidence.

Production review 3

Production review scenario: a platform upgrade affects several delegated administrators. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a time-bound exception record and compensating-control validation as evidence.

Production review 4

Production review scenario: a workload team needs a temporary policy exception. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an account lifecycle and cost-ownership plan as evidence.

Production review 5

Production review scenario: a new team must be onboarded without management-account access. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a drift-detection and audit-evidence checklist as evidence.

Production review 6

Production review scenario: a logging destination policy is being hardened. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a migration sequence with prerequisites and stop conditions as evidence.

Production review 7

Production review scenario: a network inspection change risks asymmetric routing. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require an approved decision record and explicit ownership map as evidence.

Production review 8

Production review scenario: a business-critical service needs a tested account exit path. For Operating model review, define SLO, change freeze, peer review, failure alarms, OU/account canary strategy, rollback conditions, evidence retention and recovery ownership. Tabletop the target failure, cross-team escalation and business communication; require a staged canary plan with measurable entry and exit criteria as evidence.

Triage case 1

Symptom: expected and observed state diverge for Operating model review. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 2

Symptom: expected and observed state diverge for Operating model review. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 3

Symptom: expected and observed state diverge for Operating model review. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 4

Symptom: expected and observed state diverge for Operating model review. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 5

Symptom: expected and observed state diverge for Operating model review. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 6

Symptom: expected and observed state diverge for Operating model review. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 7

Symptom: expected and observed state diverge for Operating model review. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

Triage case 8

Symptom: expected and observed state diverge for Operating model review. Contain blast radius first. Confirm request ID, time, principal, account and Region; inspect CloudTrail management events, service health, quotas and delegation. Test identity authorization, explicit SCP deny, resource policy, service control plane and propagation delay separately. Preserve raw evidence, reproduce in one test account, and never “fix” by removing organization safeguards.

  1. Operating model review check 1: which evidence proves the design meets its constraint?
  2. Operating model review check 2: which evidence proves the design meets its constraint?
  3. Operating model review check 3: which evidence proves the design meets its constraint?
  4. Operating model review check 4: which evidence proves the design meets its constraint?
  5. Operating model review check 5: which evidence proves the design meets its constraint?
  6. Operating model review check 6: which evidence proves the design meets its constraint?
Show answer guide

A strong answer names the boundary, owner, positive and negative verification, risk and rollback—not merely a product name.

Instructor narration / 讲师讲解提纲

Ask learners to state the business outcome for Operating model review, then draw the trust boundary. Probe overlooked failure paths, unobservable assumptions and the team bearing the risk. Each group closes with a three-minute pitch: one option, one trade-off, one unresolved question and one test that could disprove the design.

Review prompts / 复习提问

Explain it to an account owner; identify what changes when the organization grows tenfold; state the safest evidence to collect; name the first rollback signal.

Next →

Field checklist / 实战清单

IaC boundaries and repository model

Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Landing Zone Accelerator pipeline

Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

AFT lifecycle and customization

Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Pipeline roles and trust

Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Drift, upgrades and release gates

Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Migration waves and adoption

Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Change simulation lab

Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Operating model review

Automate governed account provisioning with IaC and pipelines, then manage upgrades, drift, migration and platform change.

Official references / 官方参考